A new build starts from individual components selected through an ASUBURE fitting, an existing fitting or build specification, or a clearly defined customer request.
Create equipment from selected components to defined specifications.
Available currently for
/Driver
/Fairway Wood
/Hybrid
/Individual iron
/Partial iron set
/Complete iron set
Wedge and putter builds are not currently offered.
02 / Retrofit
Keep what works. Change what does not.
When an existing major component remains suitable—for example, the head performs correctly but the shaft does not—a retrofit retains that component while the club is rebuilt around the required specification.
A fitting does not have to end with new clubs. It should end with the right decision.
Build process
From definition to verification.
Each stage moves the build from an intended specification to finished equipment that can be checked against it.
01
Define
Establish components and intended specifications.
02
Prepare
Inspect, measure and prepare each relevant component.
03
Assemble
Build the club from the prepared components.
04
Match
Evaluate the relationship between clubs where applicable.
05
Verify
Check the finished equipment against the intended specification.
Components / Prepared for build
Preparation
Preparation is part of the build.
/Shaft preparation
/Trimming where applicable
/Frequency / flex evaluation where applicable
/Spine check and alignment where applicable
Three ways to begin
01
From an ASUBURE fitting
The fitting identifies the recommended components and specifications.
02
From an existing fitting or build specification
ASUBURE can build from a sufficiently detailed external fitting or build specification.
03
With your own components
Customer-supplied heads, shafts, grips, adapters, ferrules and other compatible components are welcome, subject to inspection and suitability.
Retrofit process
More than a component swap.
The existing club is carefully disassembled. Components for reuse are recovered, cleaned, inspected and prepared before the normal build process begins.
Because retrofit includes disassembly and component preparation, service labour may be higher than for an equivalent new build.
01
Disassemble
02
Recover
03
Clean
04
Inspect
05
Prepare
06
Rebuild
07
Match
08
Verify
Specification record
Measured. Recorded. Verified.
Relevant build specifications are measured and recorded by field, then checked against the intended specification. The applicable measurements depend on the club or set.
Verification / Swingweight measurement
Per club
Head weight
Shaft weight
Playing length
Frequency
Swingweight
Total weight
Loft
Lie
Iron sets where applicable
Length progression
Weight progression
Swingweight progression
Frequency progression
Loft progression
Final quality control
QC verified.
The completed club or set is checked against the intended specification before collection. Assembly finishes the club. Verification finishes the build.
Playing length
Swingweight
Total weight
Frequency
Loft
Lie
Relevant set progression
Visual and assembly inspection
Not every listed measurement applies to every club or build. A set is evaluated as a system—not as isolated clubs.
Testing & collection
Where appropriate, completed equipment may be tested on the ASUBURE simulator before collection or independently at the range.
Documented project / Complete set build
Documented build
TaylorMade Qi Max · Qi4D Max
A complete custom set using different shaft families, with intentional specification and progression throughout.
Components support the build.Specification drives the decision.
ASUBURE is not a standalone component store. Components may be sourced as part of a build, and customer-supplied compatible components are welcome subject to inspection and suitability.
Build enquiry
Discuss a build
New build or retrofit—describe it in plain language. If a fitting is needed first, Johan will say so. Submitting an enquiry does not commit you to any work.
Bringing your own components?
Send details of the heads, shafts or grips you already own. Johan will confirm what can be used, what needs measuring, and what should be replaced.